Hangzhou Jiufeng MSW Plant Project SCR Denitration System

Column:Case Study 午夜妇女AAAA区片

Project Description:

Hangzhou Jiufeng MSW Incineration Power Plant Project covered an area of 139.7 thousand square meters. The project was equipped with four 750 t/d multi-stage hydraulic grate furnaces and two 35 MW turbo-generator sets. The project also includeded supporting environment protection engineering like flue gas treatment system, wastewater treatment system, ash system, etc. Once completed, the project was designed to have an annual performance period of 8000 hours and a daily MSW treatment capacity of 3000 tons.

STC provided four sets of SCR System for 750 t/d single waste incineration furnaces, including equipment, accessory equipment, the electric system and I&C system of the equipment. When the system was working, the NOx concentration would be reduced to 50 mg/Nm3 or below. Also, the concentration of dioxins would be lower than 0.01 ng/Nm3. The environmental protection indexes of this project could meet or exceed all EU 2000 standards, which made this project a benchmarking project in the waste incineration industry in China.


Process Design:

天天躁日日躁狠狠很躁

The whole four SCR DeNOx furnaces of the plant shared one ammonium hydroxide storage system with the SNCR system .